
Midwest Industrial Tanks Waste Oil Tank
Questions? Call our US Based team: 1-800-964-5341 (9am-9pm; 7days a week)
8 to 10 Week Lead Times
Please call for exact ship dates.
Free Local Pickup Available at Columbus, NE facility.
Questions? Call or Text Us: 800-964-5341 Mon to Sun 9am-9pm ET
Questions? Call or Text Us:
800-964-5341
Mon to Sun 9am-9pm ET
Questions? Call our US Based team: 1-800-964-5341 (9am-9pm; 7days a week)
8 to 10 Week Lead Times
Please call for exact ship dates.
Free Local Pickup Available at Columbus, NE facility.
The Midwest Industrial Tanks UL 142 listed Waste Oil Tank features a unique double-wall clamshell design that meets SPCC regulations, eliminating the need for a secondary containment tank. The double wall fuel storage tanks are manufactured with carbon steel.
The tank is constructed with a 12 gauge carbon steel outer tank that fully contains the entire contents of the 10 gauge carbon steel inner tank.
Midwest Industrial Tanks Waste Oil Tanks are used in the following industries:
Choose from the following sizes:
Notable Features include:
Are the Fuel Storage Tanks UL 142?
Yes, all above ground fuel storage tanks manufactured by Midwest Industrial Tanks are built to UL 142 specifications.
What are the benefits of the Clamshell design?
Midwest Industrial Tanks offers an innovative clam-shell design for its fuel storage tanks.
The clam-shell design results in a more secure tank that minimizes leaks. The unique design also creates a more appealing visual design.
The “Clamshell” design consists of the following:
Are the Fuel Storage Tanks compliant with SPCC?
Yes, the double wall clamshell design meets SPCC regulations, eliminating the need for a secondary containment tank.
The Oil Pollution Prevention Regulation (40 CFR 112) requires a regulated facility to construct and operate in accordance with industry standard practices. A plan of action and prevention must be in place in order to comply with this regulation.
Plan Required: An SPCC plan assures the EPA that a farm or facility has planned actions to prevent spills from an above ground tank. The EPA believes that an SPCC plan will prevent an oil spill from impacting streams, creeks, lakes, ponds and other surface water.
What is an SPCC Plan? An SPCC plan must list countermeasures used to prevent spills, such as procedures and equipment to contain spills. These are NOT spill contingency plans that focus on actions after a spill, but actions to PREVENT spills before they occur.
Who must have one? The regulation applies to non-transportation-related facilities, including farms, that:
Estimated Product Handling: 2 to 3 days
After placing an order, customers have up to 48 hours to cancel the order unless the item has been crated and/or shipped.
Orders for large or heavy items ship via a trucking carrier. Freight delivery is typically 2 to 6 business days, allow extra time for remote locations.
The Freight Carrier or Tucking company will contact you to set up an appointment time before delivering. Once your product leaves our warehouse, we will send you an email with a link to the freight carrier’s website and the tracking number. Tracking numbers take 1 business day to update.
Package Inspection
Please inspect your package upon delivery. If there is obvious damage, please note the damages on the delivery receipt. Contact us within 24 hours to report the damage, by either e-mail or phone. Please retain all original boxes and packaging.
Returns (Applies to Midwest Industrial Tanks only)
All Midwest Industrial Tanks include a 1 year limited warranty.